5ae66af5d2 rework v2 scheduler upgrade; drop downgrade
- Rework V2 upgrade so that it no longer resets cards in learning,
or empties filtered decks.
- V1 users will receive a message at the top of the deck list
encouraging them to upgrade, and they can upgrade directly from that
screen.
- The setting in the preferences screen has been removed, so users
will need to use an older Anki version if they wish to switch back to
V1.
- Prevent V2 exports with scheduling from being importable into a V1
collection - the code was previously allowing this when it shouldn't
have been.
- New collections still default to v1 at the moment.

Also add helper to get map of decks and deck configs, as there were
a few places in the codebase where that was required.
2021-02-21 15:50:41 +10:00
Damien Elmes
ab790c1d14 initial work on moving v2 card answering into backend
Not plugged into the Python code yet. Still a work in progress.

Other changes:

- move a bunch of From implementations out of the giant backend/mod.rs
file into separate submodules.
- reorder backend methods to match proto order
- fix some clippy lints
2021-02-20 14:48:07 +10:00
Damien Elmes
704b5e581a Rework reschedule tool
The old rescheduling dialog's two options have been split into two
separate menu items, "Forget", and "Set Due Date"

For cards that are not review cards, "Set Due Date" behaves like the
old reschedule option, changing the cards into a review card, and
and setting both the interval and due date to the provided number of
days.

When "Set Due Date" is applied to a review card, it no longer resets
the card's interval. Instead, it looks at how much the provided number
of days will change the original interval, and adjusts the interval by
that amount, so that cards that are answered earlier receive a smaller
next interval, and cards that are answered after a longer delay receive
a bonus.

For example, imagine a card was answered on day 5, and given an interval
of 10 days, so it has a due date of day 15.

- if on day 10 the due date is changed to day 12 (today+2), the card
is being scheduled 3 days earlier than it was supposed to be, so the
interval will be adjusted to 7 days.
- and if on day 10 the due date is changed to day 20, the interval will
be changed from 10 days to 15 days.

There is no separate option to reset the interval of a review card, but
it can be accomplished by forgetting the card(s), and then setting the
desired due date.

Other notes:

- Added the action to the review screen as well.
- Set the shortcut to Ctrl+Shift+D, and changed the existing Delete
Tags shortcut to Ctrl+Alt+Shift+A.
2021-02-07 21:57:51 +10:00
Damien Elmes
7d8448a321 decks start collapsed 2021-02-02 17:14:11 +10:00
Damien Elmes
a9ea8e11a2 fix filtered decks not honoring sort order
https://forums.ankiweb.net/t/2-1-36-filtered-decks-bug/5649/
2020-12-09 22:50:49 +10:00
Damien Elmes
56ceb6ba76 set_deck() 2020-09-03 17:42:46 +10:00
Renamed from rslib/src/decks/filtered.rs (Browse further)